Mar 21,2025
Case 4: Commercial project

Dallas Smart Logistics Center (2023)

Customer pain points:

▸ A 18m column-free space is required to accommodate automated racks

▸ Energy consumption in cold storage accounts for 35% of operating costs

Solution:

✅ SmartSpan™ Long-Span System - Achieving a 21m column-free space (exceeding demand by 17%)

✅ Triple insulation enclosure - reducing cold storage energy consumption by 38%

✅ Robot welding production line - key components with an accuracy of ±0.5mm

achievements:

Warehousing efficiency has increased by 27%, resulting in annual electricity cost savings of $186,000.